Another Construction Update
So, despite the uncooperative weather, and the other snags, construction continues. We are still hoping to be basically done by the end of the year, but let’s see. I am sure that, no matter what, there will still be lots of little details to be finished up in the new year.
At this point we have the security screen door installed, interior doors, shelves and rods inside closets, framing and baseboard basically finished, and the upstairs niche built up.
Looking at the screen door from the inside of the house
Keegan of course enjoys seeing all the changes and almost every day comes with me to inspect the work.
can I play with these cool power tools?
But my favorite part at this point are the wall tile in the bathroom. I really love how they turned out, and I already know that that bathroom will become MY bathroom.
This week we will hopefully have the bathroom floor installed, and then it will be time for the paint color selection, the stairs railing, the lighting and all the other details. Details that include, securing a permanent mortgage and dealing with two different banks. Blah.
Comments are off for this post